Calculate square footage to cubic yards.

The volume of the center prism: 0.5 * A * B * H. V = the volume in cubic feet. A = length A. B = length B. H = height. The two results are added together for a cubic foot value and converted to cubic yards by dividing the cubic feet by 27. Enter the height of the pile and the base length of the pile in feet.

Calculate square footage to cubic yards. Things To Know About Calculate square footage to cubic yards.

Click “Calculate” in the concrete footing calculator above to get an estimate of how much concrete will be needed. For example, if you need a footing that is 6’ long, 12’ wide, and 8” deep, the equation would look like this: (6 x 12) x 8 = 576 cubic feet. Then divide that number by 27, which is the number of cubic feet in a yard, and ...Example: Calculate the capacity of a generator if the length is 20 inches, the width is 60 inches, and the height is 80 inches. Solution: Step 1: Multiply the given measurements in inches. Volume = length x width x height. = 20in x 60in x 80in. = 96000 in 3. Step 2: Divide the result by 1728 to convert it into feet. = 96000 / 1728 ft 3.Cubic Yards. Cubic yards are a unit of volume commonly used in the United States. One cubic yard is equal to 27 cubic feet. The Cubic Yards Calculator is used to calculate the volume of an object in cubic yards. Formulas. The following are some of the most common formulas used in the Cubic Yards Calculator:About 2.47 cubic yards without considering the waste factor, and 2.72 cubic yards with a waste factor of 10%. That's 3.7 and 4.1 US tons, respectively. To calculate crushed stone in yards: Multiply together the length, width, and depth measured in feet. Divide by 27 to convert cubic feet into cubic yards.

Calculate Rip Rap 12" - 24" - Large Boulders. Type in inches and feet of your project and calculate the estimated amount of Rip Rap / Boulders in cubic yards, cubic feet and Tons, that your need for your project. The Density of Rip Rap 12" - 24" - Large Boulders: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. Type in your numbers. A: Depth. inches. B:About 2.47 cubic yards without considering the waste factor, and 2.72 cubic yards with a waste factor of 10%. That's 3.7 and 4.1 US tons, respectively. To calculate crushed stone in yards: Multiply together the length, width, and depth measured in feet. Divide by 27 to convert cubic feet into cubic yards.

To convert area measurements to volume, use our online calculator to convert square feet to cubic yards. Utilize our tool to quickly convert dimensions.

There are 9 square feet in 1 square yard. To convert from square yards to square feet, multiply your figure by 9 (or divide by 0.11111111111111) . What is a square foot? The square foot is used as a form of measurement within Canada and the United States. It can be adopted to describe the amount of floor space (for real estate) or the overall ...HomeAdvisor's paver calculator will help you calculate the amount of paver and base you need for the size of your patio or driveway. ... Divide by 27 to convert to cubic yards; Add an extra 10% for waste; ... Small stones are usually 0.2 square feet per stone, mediums are 1 square foot per stone and large ones are 1.71 square feet per stone ...Volume = 50 sq. feet x 2 inches = 0.3 cubic yards, or 8.3 cubic feet. Calculate compost needed: how much compost for an existing lawn? ... Volume = 8,800 sq feet x 1/2 inch = 13.6 cubic yards or 367 cubic feet. ... click on the Compost weight section of the calculator; one 1-cubic foot bag typically weighs about 40 pounds.Calculate #57 Granite Stone. Type in inches and feet of your project and calculate the estimated amount of Granite Stone in cubic yards, cubic feet and Tons, that your need for your project. The Density of #57 Granite Stone: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. Type in your numbers. A:One cubic yard of the material covers a 324-square-foot area an inch deep. So, to determine your total, multiply your square footage by the depth in inches desired, then divide by 324. Here's your formula: Square footage x desired depth / 324 = cubic yards needed. Or, plug your measurements into an automatic mulch calculator.

Calculate Limerock. Type in inches and feet of your project and calculate the estimated amount of Base Material in cubic yards, cubic feet and Tons, that your need for your project. The Density of Limerock: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. Type in your numbers.

So for example, if the height of your 1800 square feet area is 1 inch, then this is how you would calculate 1800 square feet to cubic yards using our formula: (ft² × (height ÷ 12)) ÷ 27 = yds³. (1800 × (1 ÷ 12)) ÷ 27 ≈ 5.556. 1800 square feet ≈ 5.556 cubic yards. Below is a list of 1800 square feet converted to cubic yards using our ...

For example, let’s calculate the cubic yards for a space that is 12 ft long by 14 ft wide by 9 inches deep. Since we already know the space’s dimensions, the next step is to convert all measurements to feet. Note that the depth measurement is in inches. depth = 9 inches ÷ 12 depth = 0.75 feet. Next, calculate the volume in cubic feet. 100 square feet One cubic yard of soil covers 100 square feet at a 2 inch depth. ... in the previous example might need to be compacted by 10% when filled into the ground to convert the unit to Compacted Cubic Yards. To calculate this, you would multiply 1.25 LCY by 1.1, which equals 1.38 Loose Cubic Yards to equal one Compacted Cubic Yard. ...1 Square foot (sq ft) is equal to 0.111111 square yard (sq yd). To convert square feet to square yards, multiply the square foot value by 0.111111 or divide by 9. For example, to find out how many square yards there are in 1500 sq feet, multiply 1500 by 0.111111, that makes 166.666667 sq yards in 1500 sq feet.1. Multiply the square footage of the bed by the number of inches of mulch you want on top of it2. Divide that number by 324. Now you have the amount of mulch needed in cubic yards. For example, if your bed is 50 feet long by 10 …The Difference Between Linear Feet and Square Feet. Measurement Calculators. Inch - Unit of Measurement Definition

This will give you your cubic yards.*. Example. If you have an area that the square footage is 100 square feet and you want the product 4" deep. 4 /12 = .3333 (depth divided into 12") 100 X .3333 =33.33 (Square feet multiplied by depth) 33.33 / 27 = 1.2344 (converted into yards) You would need 1-1/4 yards of product.Generally speaking, one cubic yard of mulch covers an area of 324 square feet. Those numbers apply if you want your mulch to be 2 inches deep. Simply put, to calculate how much mulch you need to cover a yard: multiply the desired square footage area by the desired depth in inches and divide the result by 324.Determine the width, length, and depth of the area you want to concrete. Multiply width by length (this = Square Footage) Convert depth from inches into feet by dividing by 12. Now multiply the square footage (width x length) by the converted depth (depth inches / 12) This is the total cubic feet needed. To convert into cubic yards, start by ...25 * 12.666 * 0.5 = 158.325 cubic feet You will need 158.3 cubic feet of concrete for this slab Usually, the cost for the concrete is for a price per cubic yards or cubic metres. To change cubic feet to cubic yards: There are 27 cubic feet in one cubic yard. Divide your cubic feet amount by 27 to get to the cubic yard volume of concrete. 158. ...Volume Calculator. This calculator is based on 6 - 94 Lb. sacks of Portland Cement per cubic yard (3000psi). Portland Cement Bag Calculator 27 cubic feet equals 1 cubic yard. Enter square feet of project. Example: 200 cubic feet, 44.4 bags of cement. Round off answer to next even higher figures. This calculator is intended for approximate guidance.

10 x 10 = 100 square feet; 4 ÷ 12 = .33; 100 x .33 = 33 cubic feet; 33 x .037 = 1.22 cubic yards; Essentially you are solving for volume and then converting to cubic yards. For concrete, the formula for volume is as follows: length x width x thickness. To determine how many bags of concrete you will need, divide the total cubic yards needed by ...

Take the area covered by your pond (area = π × (2 m)² / 4 = 3.141 m²). Multiply this by your pond's depth to obtain its volume (volume = 3.141 m² × 0.6 m = 1.884 m³). Finally, multiply this volume by 264.172 to get the volume in gallons (volume in gallons = 1.884 m³ × 264.172 gallons/m³ = 498 gallons).Height (ft): Volume in: Cubic Feet: Cubic Meters: Cubic Yards: Cubic Inches: To determine cubic feet, measure your object's width, length, and height and type each dimension into our calculator. If you prefer to do calculations yourself, determine the cubic feet of an area with the following formula: Cubic feet = length x width x height in feet.The topsoil you want is sold by the cubic foot, so we need to do a conversion and calculation. Convert our depth figure from inches to feet (so that units are the same). There are 12 inches in a foot. 3 ÷ 12 = 0.25 ft. Our topsoil depth is 0.25 ft. Cubic feet = square feet × depth. So: 20 × 0.25 = 5. We have our total:1 square foot. 0.11111 square yards. 2 square feet. 0.22222 square yards. 3 square feet. 0.33333 square yards. 4 square feet. 0.44444 square yards. 5 square feet.A cubic yard is a measure of volume, or how much matter can fit in a space, such as a trailer. ... Use the calculator to multiply 28 times 8 times 9, which equals 2,016 cubic feet. Step 3. Convert cubic feet into cubic yards by dividing by 27: 2,016 divided by 27 equals 74.7 cubic yards. References. Federal Highway Administration: Commercial ...To find the amount of concrete you need, use our concrete calculator or this simple volume formula: Length × Width × Thickness. Measure your project and multiply the dimensions to get cubic feet or meters. Divide by 27 to convert cubic feet to cubic yards. Using our concrete calculator ensures accuracy and saves time.To determine the amount of crushed stone for your project, you need to know either the square footage or length and width of the area you’re covering, plus the desired depth. Different projects require different thicknesses of crushed stone. ... (16 x 18 x .33) ÷ 27 = 3.52 cubic yards. To determine how many tons you need, multiply your …Length: 12 feet; Depth: 0.5 feet; To calculate cubic yards, we multiply 6 × 12 × 0.5 to get a total of 36 cubic feet. We then divide by 27 to get 1.33 cubic yards. How to convert square feet to cubic yards. To convert square feet to cubic yards, simply multiply your square footage figure by the height/depth in feet. This gives you a result in ...Calculate square footage, square meters, square yardage and acres for home or construction project. Calculate square feet, meters, yards and acres for flooring, carpet, or tiling projects. Enter measurements in US or metric units. How to calculate square footage for rectangular, round and bordered areas. Calculate project cost based on price per square foot, square yard or square meter.HomeAdvisor's paver calculator will help you calculate the amount of paver and base you need for the size of your patio or driveway. ... Divide by 27 to convert to cubic yards; Add an extra 10% for waste; ... Small stones are usually 0.2 square feet per stone, mediums are 1 square foot per stone and large ones are 1.71 square feet per stone ...

How to Use a CA6 Gravel Calculator: Input the length of the project area in feet. Input the width of the project area in feet. Input the desired depth of the CA6 gravel in inches. Click the "Calculate" button. The calculator will provide an estimate of the quantity of CA6 gravel needed in cubic yards.

This is the total cubic feet needed. To Convert into cubic yards, start by dividing cubic feet by 27. Finally, ask your supplier what the density of the gravel or stone you will be using to convert into tons. Typically gravel has a density of 1.42 t/yd 3. So multiply the density by the cubic yard to equal total tons.

Instant free online tool for pound/cubic foot to pound/cubic yard conversion or vice versa. The pound/cubic foot [lb/ft^3] to pound/cubic yard [lb/yd^3] conversion table and conversion steps are also listed. Also, explore tools to convert pound/cubic foot or pound/cubic yard to other density units or learn more about density conversions.Width (ft) Desired Depth (inches) 2-3" over previously mulched areas. 3-4" for new mulched areas. Diameter of Circle (ft) Desired Depth (inches) 2-3" over previously mulched areas. 3-4" for new mulched areas. Enter your dimensions to calculate the amount of cubic yards.The concrete also should be 4 inches thick, provided it's for foot traffic only (not cars). Both gravel and concrete typically are sold -- and delivered -- by the cubic yard. To calculate what you need, multiply the walkway's width and length to find the square footage; for example a 4-foot-wide, 50-foot-long walkway covers 200 square feet.Feb 3, 2021 · How to Calculate Landscaping Rock. Compute the volume in square feet by determining these measurements first: The length of your area in feet. The width of your area in feet. The depth of the stone in feet—divide the depth by 12. The landscape rock formula is as follows: (Length x width x depth) / 27. This final number is how many cubic yards ... Fill 100 cubic feet with concrete calculating price per unit volume. For our final example, let’s say I want to fill a space measuring 100 cubic feet with standard concrete (density 150 ). At this stage I am unsure of the price per unit volume but I can purchase 5 cubic yards for $540.Conversion between cubic feet and square yard. Note: Fill in one box to get results in the other box by clicking "Calculate" button. Data should be separated in coma (,), space ( ), tab, or in separated lines.For this, let's assume this value to be D = 0.5 yards. Multiply the depth with the area to get the volume: V = 200 x 0.5 = 100 yd3. This is the volume of soil needed to cover an area that has a length of 20, a width of 10 and a depth of 0.5 yd. You can check the accuracy of this value using the cubic feet calculator for soil.Total Concrete = Volume + Additional Volume. Total Concrete = 190.08 ft³ + 9.50 ft³. Total Concrete = 199.58 cubic feet. Therefore, you will need approximately 199.58 cubic feet of concrete to cover a 24×24 slab with a thickness of 4 inches.Advertisement Square is more than a mobile cash register. It also offers free apps for making payments with your smartphone and e-mailing money to your friends. Square Wallet is a ...How Much Does a Bag of Mulch Cover? Mulch is typically sold in bags of 50 L or 2 cubic feet. To cover a 200 sq. ft. garden with mulch 4 inches deep, you would need about 38 50 L bags of mulch, or 34 2cu ft bags. Be sure to consider the area of the garden bed that will be taken up by plants, and subtract that from your calculation.Cubic Yards Needed. Stone. Length in Feet X Width in feet x depth in feet (inches divide by 12 to convert to feet) then divide by 27 to get cubic yardage. Approximate compaction factor 15% - multiply by 1.15 to get total yardage. 80 ' x 24 ' x 4 inches deep of 6AA stone. ( (80 x 24 x .333) / 27 ) x 1.15 = 27.26 yards.

You are aerating and reseeding your lawn and want to give it a healthy layer of compost as well. The lawn is 110 feet by 80 feet in size. Area = 110 x 80 = 8,880 sq feet. Since you are just adding on top of an existing lawn, you will add 1/2 inch of compost to the lawn. Volume = 8,800 sq feet x 1/2 inch = 13.6 cubic yards or 367 cubic feetSince 1 yd = 3 ft, we can calculate how many cubic feet are in a cubic yard: A cubic yard is: 1 yd³ = 1 yd × 1 yd × 1 yd. Convert yards to feet: 1 yd³ = 3 ft × 3 ft × 3 ft. Multiply all quantities: 1 yd³ = 27 ft³2 days ago · Step 3: Convert the result into the units you want — in this case, cubic feet. To convert from cubic yards to cubic feet, you need to multiply the result by 27: \footnotesize \text {Volume} = 15 \times 27 = 405\ \text {ft}^3 Volume = 15 × 27 = 405 ft3. Find the depth you want and divide your square footage by the square footage listed. For instance, if you want to cover 500 square feet with rubber mulch 3.0 inches deep, take 500÷287=1.75 (rounded up to 2 pallets). Or you can use our rubber mulch calculator. Just enter the depth, width, and length of each rectangle and instantly find out how ...Instagram:https://instagram. verrazzano bridge closedis cristy lee marriedp1762 codehow many days in a row can i take nyquil Type in inches and feet of your project and calculate the estimated amount of Decorative Stone in cubic yards, cubic feet and Tons, that your need for your project. The Density of 3/4" - 2" Red Brick Chips: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. Type in your numbers.This square yards calculator - an example. Imagine you want to put on some turf in your garden, but all you have is the width and length of the fence in feet. Yet, in the shop, they ask for the area given in square yards. Width - 120 ft. Length - 80 ft. yardage = 120 ft × 80 ft yardage = 120f t×80f t. yardage = 9600 ft^\text {2} yardage ... pf2e staffsteven crowder butt Many suppliers sell large quantities of gravel by the ton. Converting from cubic yards to tons requires knowing the density of the gravel; while this can vary, our gravel calculator keeps it simple by using the standard 2,835 lbs per cubic yard for density. Thus, 1 cubic yard = 2,835 lbs / 2,000 lbs = 1.42 tons.If you're mulching a flower bed that is 10 ft long and 3 feet wide, and you want your mulch to be .25 ft deep (3 inches), calculate cubic feet by multiplying those numbers. 10 x 3 x .25 = 7.5 cubic feet. To determine how many cubic yards of mulch you'll need, divide your cubic feet by 27. 7.5 ÷ 27 = .278 cubic yards. keybank allpoint atm Step 2: Convert to Cubic Yards. Gravel is often sold by the cubic yard, so you'll need to convert your measurements from cubic feet to cubic yards. Divide the cubic feet value by 27. For instance, in the circular pond example, you'd need: 135.3 cubic feet / 27 = approximately 5.01 cubic yards of gravel.Multiply 24 x 24 x (4/12) to get 190 cubic feet. Divide 190 by 27 to get 7.04 cubic yards of total concrete needed. Multiply 190 by 0.0283 to get 5.38 cubic meters of total concrete needed. Remember, there are 27 cubic feet in one cubic yard of concrete (3 x 3 x 3). LEARN HOW TO POUR YOUR OWN CONCRETE SLAB HERE.